3 pass fire tube heavy crude boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :3 pass fire tube heavy crude boiler
  • Supply Capacity : 10 units/month :3 pass fire tube heavy crude boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

About us Fangkuai has more than 20 years of experience in R&D and manufacturing of green energy-saving boiler equipment, and is committed to designing and producing boilers that meet customer needs.
Contact us

Global Sales Hotline

telephone:
0086-55929010

Email: [email protected]

Voicemail
  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    (1) You must meet each emission limit and work practice standard in Tables 1 through 3, and 11 through 13 to this subpart that applies to your boiler or process heater, for each boiler or process heater at your source, except as provided under § 63.7522. The output-based emission limits, in units of pounds per million Btu of steam output, in Get Price

  • Combustion Evaluation: Sources and Control Devices

    From light to heavy, typical fractions are: (1) naphtha (2) gasoline (3) kerosene, and (4) gas oil. air needed for com- bustion. A shutter or similar device regulates amount of air so induced. Gas and air together pass through a tube leading to the burner ports, mixing in the process. Case history of a 20 gph fire tube hot water boiler Get Price

  • Atlantic Latest - Bluebell Railway in Sussex

    Jul 12, 2021 · The boiler requires a little further work before it is ready for its hydraulic test, but a change in the dating of boiler test certificates from the steam test date to the hydraulic test date required by our boiler inspector means that we wish to delay the hydraulic test in order to gain as much time in service from the test date as possible.To Get Price

  • Atlantic Latest - Bluebell Railway in Sussex

    Jul 12, 2021 · The boiler requires a little further work before it is ready for its hydraulic test, but a change in the dating of boiler test certificates from the steam test date to the hydraulic test date required by our boiler inspector means that we wish to delay the hydraulic test in order to gain as much time in service from the test date as possible.To Get Price

  • eCFR :: 40 CFR Part 63 Subpart DDDDD -- National Emission

    (1) You must meet each emission limit and work practice standard in Tables 1 through 3, and 11 through 13 to this subpart that applies to your boiler or process heater, for each boiler or process heater at your source, except as provided under § 63.7522. The output-based emission limits, in units of pounds per million Btu of steam output, in Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    6. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65%, heating surface area is 0.91 m 2 per Bo. Hp, and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    6. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65%, heating surface area is 0.91 m 2 per Bo. Hp, and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price